top of page

Ride 520 on 5/20


Thanks for all of those who joined us on biking SR-520 bike/pedestrian bridge on 5/20/2018. It was a historical moment in that this was WSDOT's informal ribbon-cutting opening of the #SR520Trail .

Pictures from the event can be found here.

To learn more about the SR-520 Trail click here.

Featured Posts
Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
bottom of page